Location:        

 

 

Planned Development:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Development Period:

 

 

Developers:     

 

Type of Financing:

 

Total Amount:

 

 

 

PROJECT SUMMARY

La Flor Del Desierto

(The Flower of the Desert)

Home

Project Description

Project Evaluation

Profiles of Principals

Contractors

 

Funds and Proforma

Project Appraisal

Site Map

Map—Mexico

Pictures of Site

Project Updates

La Escalera Nautica

Submitted By:

 

Stettner Asociados S.A. DE C.V.

1149 Avenida Vallarta, Suite 101

Guadalajara, CP  44140

Jalisco, Mexico

 

Baja Sur, California, Mexico, 60 miles from LaPaz and 70 miles north of Cabo San Lucas.  Situated on 4,853 hectares, with 14.5 km of Pacific Ocean frontage.   (See sitemap)

 

250-room 4-Star Hotel with 50 separate villas, operated by Hilton with a Marina and 18-hole golf course, Health spa with mineral baths,  Swimming pool, Tennis courts and other sports amenities.

 

A full-service marina will be constructed, incorporating the existing shallow lakebed which will be dredged to allow for installation of docks accommodating smaller vessels.  The Marina will be designed to accommodate any size Yacht and Sailing Vessel.  A Jetty will be constructed to provide additional shelter.

 

20 Condominiums will be built that will serve as Time-share units and model homes for  the first phase of a residential development. The site will be surveyed for 100 free standing Residential Homes and several Condominiums.

 

An airfield will be contructed with runways and hangers to accommodate corporate jets. Tropical greenhouses will be erected to cultivate plants and vegetation to be used at the site and also function as a tourist attraction.

 

The site will be developed with a complete water works providing for the fresh water and waste water treatment for the hotels & accommodations and engineered to service the planned residential development. Alternative power generation facilities utilizing biomass or solar photovoltaic cells will be incorporated into the development to provide supplemental electrical utilities for the hotel.  Also a state-of-the-art telecommunication network will be installed into the project.

 

36 months

 

Jaime de la Peña Stettner

William D. Babich

Carlos Silva Corcuera 

 

PROJECT FUNDING

 

US$156,240,000.00

(First Draw Down of US$15,000,000.00)

 

 

 

For further information contact

©The Palmyra Company 2004 AFPO

The Palmyra Company

palmyra_company@yahoo.com